Responsible for the service Energy Authority
Registry
- Service location
The Registry of the Energy Authority shall be responsible for receiving and registering documents coming to the Authority's disposal.
The Registry receives requests for information and documents.
You can contact the Registry by e-mail, telephone or mail.
Visiting address
Lintulahdenkuja 2 A
00530 Helsinki
Service hours
Monday-Friday 9.00–16.00
Other contact details
Postal address
Lintulahdenkuja 2 A
00530 Helsinki
Services
Application for a production aid verifier
Permit or other obligationNationwidePublic serviceProduction aid verifier organisations shall apply for approval to act as verifier from the Energy Authority.Applying for advance information in accordance with the Distribution Obligation Act
Permit or other obligationNationwidePublic serviceYou can apply for advance information on raw material used in the manufacture of biofuel or bioliquids upon the Distribution Obligation Act.Applying for advance information in accordance with the Sustainability Act
Permit or other obligationNationwidePublic serviceYou can apply advance information on raw material used in the manufacture of biofuel or bioliquids upon the Sustainability Act.Confirmation of terms for the holder of a liquefied natural gas treatment plant
Permit or other obligationNationwidePublic serviceLNG operator shall apply for confirmation of the terms, conditions and tariffs for the use of the treatment facilities.Confirming conditions for electricity and natural gas network operators
Permit or other obligationNationwidePublic serviceConfirming terms of the transmission and connection service of electricity and natural gas network operators and principles for charges for connectionCost-benefit analysis and notification under the Energy Efficiency Act
Permit or other obligationNationwidePublic serviceAn operator must notify the Energy Authority of the cost-benefit analysis in accordance with the Energy Efficiency Act.Indication of the price of the electricity network service
Permit or other obligationNationwidePublic serviceThe electricity system operator shall notify the Energy Authority of the price information concerning the electricity network service.Natural gas network permit
Permit or other obligationNationwide except the Åland IslandsPublic serviceNatural gas network operations may only be carried out with the permission of the Energy Authority.Notification of a wind power station operating in a compensation area
Permit or other obligationNationwidePublic serviceThe operator of a wind power station in a wind power compensation area must pay the wind power fee.Notification of fuels released for consumption
ServiceNationwidePublic serviceA fuel supplier must annually reduce the life-cycle greenhouse gas emissions of fuels released for consumption.Notification of network service terms and prices for natural gas
Permit or other obligationNationwidePublic serviceThe natural gas system operator shall notify the Energy Authority of the price information and terms of sale of the natural gas network services.Notification of the commissioning and modifications of a power plant
Permit or other obligationNationwide except the Åland IslandsPublic serviceThe Energy Authority shall be notified of any commissioning or modification of power plants.Permission to organise Certified Installer training
Permit or other obligationNationwidePublic serviceOrganisations providing installer training in accordance with the RES Directive must apply for a permission to organise the training.Power network licence
Permit or other obligationNationwide except the Åland IslandsPublic serviceA power network licence is required for the operation of an electricity distribution network.Project permit for building a power cord
Permit or other obligationNationwidePublic serviceApplying for a project permit for a high-voltage power cord.Register as an LNG operator
Permit or other obligationNationwidePublic serviceThe owner of liquefied natural gas treatment apparatus must inform the Energy Authority of the holders of the apparatus.Submission of an electricity network operator’s preparedness plan
Permit or other obligationNationwidePublic serviceElectricity network operators must submit a plan for preparing for disruptions to the Energy Authority.Submitting a natural gas network operator’s preparedness plan
Permit or other obligationNationwidePublic serviceNatural gas network operators must submit a plan for preparing for disruptions to the Energy Authority.Submitting a sustainability criteria report
Permit or other obligationNationwidePublic serviceAn operator with a sustainability criteria scheme submits an annual sustainability criteria report.
Text edited by: Energy Authority
Updated: 8/6/2022