An electricity network operator must prepare a preparedness plan to be ready for disruptions in their network, the regulatory measures required for disruptions in electricity supply and the unusual conditions referred to in the Emergency Powers Act.
To support the preparedness of network operators, the Energy Authority has prepared guidelines and templates for disruptions in normal conditions an ...
Prepare a preparedness plan in accordance with the instructions on preparedness planning. You can use the template prepared by the Energy Authority to prepare the plan.
The preparedness plan must include:
Send the preparedness plan to the Energy Authority’s registry by secured email or as a registered letter.
The preparedness plans must be submitted by the end of June in every three years, starting from 2019.