In certain situations, applying for a building permit may require a planning requirement decision or a deviation decision.

The builder must have a valid planning requirement decision, before submitting an application for a building permit, in an area not covered by the local detailed plan. The application for the planning requirement decision must be submitted to an authority designated for the t ...

Do the following

Apply for a derogation from the municipality before applying for a building permit.

Include the following documents in your application:

  • an environmental map showing the location of the area
  • a site plan showing both the existing and planned buildings or construction work at the construction site
  • a document demonstrating control of the building site or another basis for applying for a derogation
  • a report on the consultation of neighbours.

State your reasons for applying and assess the potential impacts of your construction project.

For more information, contact the building inspector.

Information on all service channels is not available in your chosen language. Change the language of the site to receive information on service channels in other languages.

To whom and on what terms

If the entrepreneur has established itself in another country in the European Economic Area and temporarily offers services in Finland, the same permits are required as from entrepreneurs established in Finland.

In certain situations, applying for a building permit may require a planning requirement decision or a deviation decision.


Period of validity

The planning requirement decision is valid for the period specified in the decision, a maximum of two years. An application for the building permit must be submitted during this period.

Background information

In certain cases, applying for a building permit can require a derogation permit (i.e. a derogation decision) or an extended building permit review.

If a builder wishes to derogate from the plan or other provisions, regulations, prohibitions or other restrictions established in the Land Use Act and the Construction Act, such as the building code, they will need a derogation permit municipality before getting a building permit. In the derogation permit, the municipality indicates the period during which the builder must apply for a building permit. The period may not exceed two years.

If the builder is applying for a building permit for an area requiring planning, the municipality will consider the specific prerequisites for a building permit during the building permit process and conduct an extended building permit review. An area requiring planning is an area where, due to previous construction or other conditions in the area, special measures need to be taken, such as constructing roads, water pipes or sewers. The environmental effects of construction in an area requiring planning may also require the municipality to conduct a more extensive review than would be typical for a building permit process.

A derogation permit can only be granted if there is a specific reason for derogation.

The derogation must not have a negative effect on planning, a plan’s implementation or other use of the area. It must also not hinder the achievement of objectives related to nature conservation or protecting the built environment, result in construction with significant impacts, or otherwise cause significant harmful environmental effects or other effects.