Procedure permit

  • Permit or other obligation
  • Tampere
  • Public service

Minor projects, such as structures, advertisements, fences, facade changes, drilling a geothermal well and building a property specific waste water system are treated as a procedural permit. Changing the heating system requires either a building permit or an procedural permit.

Do the following

The architectural plans are attached to the application, which include the position plan of the lot and, depending on the project, floor plans and facade plans, as well as observational photos.

Neighbours' consultation is attached to the application.

Information on all service channels is not available in your chosen language. Change the language of the site to receive information on service channels in other languages.

Processing time

Permits are processed in order of arrival. Processing, including waiting times, takes 1 to 4 months, depending on the permit type, region and congestion situation.

Period of validity

The permit is valid for three (3) years.